Click here to download all of the Cad files.
Click here to download all of the Cad PDFs.
Or view the PDFs separately down below.
00_00 – Sealed Cladding Systems Index of Details
01_02 – Roof Kickout Interface
02_01 – Foundation Screed Termination
02_02 – Foundation Casing Termination
02_03 – Foundation Masonry to Concrete
03_02 – Ceiling to Wall Interface
03_03 – Soffit or Beam Wrap with L Drip
03_04 – Fascia Soffit Rodded Interface
04_01 – Midwall Frame to CMU (Casing Stop)
04_02 – Midwall Frame to CMU (Screed)
04_03 – Midwall Frame to CMU (Smooth)
05_01 – Control or Panel Joints
05_02 – Control or Panel Joints Isometric
06_01 – Fin Interface Lath Wall Extruded Reciever
06_02 – Fin Interface Lath Wall Shouldered Reciever
06_03 – Jamb Interface Lath Wall Casing Separated
06_04 – Frame Window Flashing Installation
06_05 CMU – Masonry flange and Buck Installation
06_06 – CMU Sill Slope Requirements
06_07 – CMU Window Return Slope Requirements
07_02 – Self Adhered Flashing at Door and Deck